Post based Innovation for Quality Improvement and Cost Reduction|Commendation News for Excellent Employee Improvement Proposals of Leisu Company

04 Nov
Image

To fully motivate all employees to pursue innovation and improvement, tap optimization opportunities in craftsmanship, workflows and software management, and implement the incentive mechanism for employee improvement proposals, the company encourages all staff to identify pain points and deliver practical solutions at their posts. Recently, multiple employee improvement proposals have completed review and practical verification, and the relevant employees are hereby commended.

Tang Renjie from the Production Department submitted a proposal for structural optimization of the 380‑equipment panel bracket. The original one‑piece front‑and‑rear panel bracket of Model 380 was prone to assembly interference, which hampered liquid pipeline routing and impaired the overall appearance and assembly quality of equipment. He proposed changing the one‑piece panel bracket to a split‑type structure. The solution was verified on a prototype unit on August 4, 2026 with stable operation. It effectively eliminates assembly interference and improves assembly craftsmanship and exterior quality of the equipment. A cash reward of 300 RMB is granted in accordance with company regulations.

FDC06446 (1).JPG

Ma Jianwei from the Production Department (shipping post) put forward an improvement proposal targeting cost waste in shipping operations. Under the previous shipping practice, two Model‑380 units were packed and stacked together for delivery. The total weight exceeded the load‑bearing limit of the company’s in‑house 3‑ton diesel forklift, so an external 5‑ton forklift had to be hired for each shipment, generating extra outsourcing costs. The optimized workflow adopts separate packaging for the two units: they are loaded onto the truck in two batches with the company’s existing forklift, and stacked on‑truck afterwards. This eliminates the expense for outsourced forklift rental. Verified against real‑world shipping scenarios on August 3, this solution can cut logistics costs, and a reward of 300 RMB is awarded accordingly.

FDC06436 (1).JPG

Wang Xulong, Junior Electric‑Control Software Engineer of the Electric‑Control Software Department, completed the improvement project titled Leisu Workshop Assistant — Digital Management for Production Programs and Equipment Orders. In the past, PLC and HMI production programs were manually transferred via USB flash drives and instant‑messaging tools. As equipment models and orders kept growing, issues such as version chaos, file corruption, mismatches between programs and orders occurred frequently. Manual file searching and copying consumed plenty of working hours and raised rework risks. He independently developed and deployed the Leisu Program Center and Leisu Workshop Assistant. Built on the company’s local area network, the system realizes centralized management for production programs, equipment orders and workshop documents. It supports version control, order binding, hierarchical permission management, process approval, automatic verification and offline cache functions. So far, 11 user accounts have been created, covering 13 equipment models and 16 program versions, with abundant traceable operation records. The system reduces rework caused by outdated versions and order‑model mismatches, unifies data sources for after‑sales, workshop and software teams, and boosts problem‑tracing efficiency. Full‑cycle practical verification has been finished, and a reward of 1000 RMB is granted.

The above three employees delivered feasible improvement solutions from mechanical structure, logistics shipping and software digitalization perspectives. Partial deliverables will be incorporated into company standard procedures and promoted across business scenarios.

Innovation and improvement are not limited to R&D positions. Optimization opportunities exist in production & assembly, warehousing & shipping, electric‑control software and administrative functions. The company will continuously enforce the employee improvement proposal scheme, encouraging all staff to spot waste and risks and submit improvement suggestions. Small‑scale post‑based innovations will jointly drive product quality upgrading and business cost reduction.

Leisu Administration & Finance Center

August 11, 2026

Image

Jack Zeng ( International Sales Director )

Hangzhou Leisu Cleaning Equipment Co., Ltd
                 

Do you have any questions about the car washes or the price ?
You are welcome to write an email to Leisuwash@gmail.com or you want it to be quick you can also call us on +86-15868499311